Current or planned key physical and digital transportation infrastructure to be aware of related to the M Street pilot area include the following:
- The intersections of 1st Street SE and Isaac Hulle Avenue SE on M Street have transit traffic signal priority.
- Most traffic signals on M Street SE are currently set to 120-second cycles during peak hours. The intersections at New Jersey Avenue SE have 90-second cycles to prioritize pedestrians, except on game days.
- There are currently closed-circuit television (CCTV) feeds along the pilot area that may be available by coordinating with RITIS.
- The 1st Street SE intersection currently has a 5G router, however other 5G routers may be available. Fiber is planned but is not guaranteed during this pilot period.
- There is an Automated Vehicle (AV) Monitoring Zone pilot project in the pilot area that will overlap with this pilot.
- There is also a video analytics curbside management pilot project happening on 1st Street SE just off M Street with Automotus that may still be active during this pilot period.
- DDOT is working with Ouster to possibly install LiDAR at New Jersey Avenue SE intersection during this pilot period.
- DDOT is working with Blue Halo to possibly install a vehicle to everything (V2X) roadside unit at New Jersey Avenue SE intersection during this pilot period.
This project is funded by the DC Vision Zero Office and the DC Southwest Business Improvement District (SWBID).